Howie Did It - Machining the flexi-shaft auxiliary drive. Part 2

Howie Did It - Machining the flexi-shaft auxiliary drive. Part 2 S10E10 - Howie Did It - Machining the flexi-shaft auxiliary drive. Part 2 2018

10 1

This is part two of how we made the flexi-shaft auxiliary drive system in episode 20 of Project Binky. In this part, we make the brackets to hold the alternator, a pulley, an adaptor and then put it all together. There was far too much to show in the normal episode run-time, so we thought we'd make an additional series of videos going into a bit more detail of how we did it. Hope you enjoy it.

  • Released: 2018-11-26
  • Runtime: 50 minutes
  • Genre:
  • Stars:
  • Director: